{"id":17911,"date":"2021-08-29T15:38:59","date_gmt":"2021-08-29T12:38:59","guid":{"rendered":"https:\/\/iq.mashroo3k.com\/studies\/%d9%85%d8%b5%d9%86%d8%b9-%d8%a7%d9%84%d8%b7%d9%88%d8%a8-%d8%a7%d9%84%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d9%8a\/"},"modified":"2025-03-17T11:57:12","modified_gmt":"2025-03-17T08:57:12","slug":"%d9%85%d8%b5%d9%86%d8%b9-%d8%a7%d9%84%d8%b7%d9%88%d8%a8-%d8%a7%d9%84%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d9%8a","status":"publish","type":"studies","link":"https:\/\/iq.mashroo3k.com\/en\/studies\/%d9%85%d8%b5%d9%86%d8%b9-%d8%a7%d9%84%d8%b7%d9%88%d8%a8-%d8%a7%d9%84%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d9%8a\/","title":{"rendered":"concrete block factory"},"content":{"rendered":" <div class=\"content-card study-summary\">\n    <!-- Grid -->\n    <div class=\"row no-gutter\">\n        <!-- Media -->\n        <div class=\"col-12 col-m-5\">\n                    <a href=\"#\" data-title=\"concrete block factory\" class=\"responsive-element media-element \" data-src=\"https:\/\/sa.mashroo3k.com\/wp-content\/uploads\/2021\/08\/\u0645\u0635\u0646\u0639-\u0627\u0644\u0637\u0627\u0628\u0648\u0642-\u0627\u0644\u0627\u0633\u0645\u0646\u062a\u064a-\u0627\u0644\u0645\u0639\u0632\u0648\u0644.jpg\"><\/a>\n        <\/div>\n        <!-- Content -->\n        <div class=\"col-12 col-m-7 rich-content\">\n            <h2>concrete block factory<\/h2>\n                        <p>Mashroo3k Consulting Company offers a feasibility study for a concrete brick factory project in Iraq, with the highest return on investment and the best payback period. This study is based on a series of in-depth studies of the Iraqi market size, an analysis of competitors&#8217; strategies, and the provision of competitive pricing.<\/p>\n            <p><\/p>\n        <\/div>\n        <!-- Info Bar -->\n        <div class=\"col-12 col-m-7 info-bar flexbox\">\n            <!-- Item -->\n            <h3 class=\"info-item col-auto\">share capital <strong data-counter=\"6000000\" data-sign=\" IQD\"><\/strong><\/h3>            <!-- Item -->\n            <h3 class=\"info-item col-auto\">Rate of return <strong data-counter=\"39\" data-sign=\"%\"><\/strong><\/h3>            <!-- Item -->\n                        <!-- Item -->\n                        <!-- Item -->\n                        <!-- Item -->\n            <h3 class=\"info-item col-auto\">Recovery period <strong >Second year<\/strong><\/h3>        <\/div>\n        <!-- Info Bar -->\n    <\/div>\n    <!-- \/\/ Grid -->\n<\/div>\n\n\n\n<div class=\"wp-block-tornado-components-project alignfull content-card study-subjects\"><div class=\"row row-reverse\"><div class=\"col-12 col-m-5\"><img decoding=\"async\" src=\"https:\/\/sa.mashroo3k.com\/wp-content\/uploads\/2021\/08\/\u0645\u0635\u0646\u0639-\u0627\u0644\u0637\u0627\u0628\u0648\u0642-\u0627\u0644\u0627\u0633\u0645\u0646\u062a\u064a-\u0627\u0644\u0645\u0639\u0632\u0648\u0644.jpg\" alt=\"\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-7 rich-content\"><h2><\/h2><p class=\" desc1\">Concrete blocks are produced from Portland cement, aggregate, and a mixture of fine sand and gravel. Solid or hollow concrete blocks are used in construction, with reinforcing steel reinforcing the structure to enhance its structural strength. Concrete blocks are a very popular building material for load-bearing walls and a common type of foundation for many homes. Concrete block factories target contracting companies, supply offices, and building material traders. For investors interested in investing in a concrete block factory project in Iraq, Mashroo3k provides a set of specialized feasibility studies based on up-to-date databases specific to the Iraqi market. This helps ensure the project&#8217;s success, achieves the highest return on investment, and provides the best payback period.<\/p><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-tornado-project-justifications alignfull content-card study-benifites\"><div class=\"row row-reverse\"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/sa.mashroo3k.com\/wp-content\/uploads\/2021\/08\/\u0645\u0635\u0646\u0639-\u0627\u0644\u0637\u0627\u0628\u0648\u0642-\u0627\u0644\u0627\u0633\u0645\u0646\u062a\u064a-\u0627\u0644\u0645\u0639\u0632\u0648\u0644.jpg\" alt=\"Project Products\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Project Products<\/h2><ul class=\"chelist\"><li>Concrete Blocks<\/li><li>Thermal Insulation Blocks<\/li><\/ul><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-tornado-project-justifications alignfull content-card study-benifites\"><div class=\"row \"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/mashroo3k.com\/newweoryx\/wp-content\/uploads\/2019\/12\/01.png\" alt=\"Why Mashroo3k ?\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Why Mashroo3k ?<\/h2><ul class=\"chelist\"><li><a href=\"https:\/\/mashroo3k.com\/\">Mashroo3k <\/a>has over 11 years of experience in preparing feasibility studies, conducting market research, and providing comprehensive consulting services.<\/li><li>Mashroo3k has offices in 7 international branches, located in <a href=\"\" target=\"\" rel=\"\">Saudi Arabia,<\/a> <a href=\"\" target=\"\" rel=\"\">the UAE<\/a>, <a href=\"\" target=\"\" rel=\"\">Egypt<\/a>, <a href=\"\" target=\"\" rel=\"\">Qatar<\/a>, <a href=\"\" target=\"\" rel=\"\">Oman<\/a>, <a href=\"\" target=\"\" rel=\"\">Yemen<\/a>, and <a href=\"\" target=\"\" rel=\"\">Iraq<\/a>, in addition to its agents in China, Singapore, and other countries.<br\/>Having delivered over 7,000 feasibility studies, Mashroo3k has helped thousands of clients achieve their investment goals.<\/li><li>Mashroo3k&#8217;s services are accredited and trusted by all financial institutions and funding entities across the Middle East.<\/li><li>The company\u2019s geographic reach spans 35 countries across all continents.<\/li><li>Mashroo3k holds membership in over 100 prestigious international organizations specializing in market research and business management.<\/li><li>Its team consists of 350 consultants with deep expertise in promising economic sectors, ensuring tailored solutions and strategies that meet clients\u2019 needs.<\/li><li>Mashroo3k is partnered with more than 10,200 suppliers across 22 countries, providing logistical support for projects, including production lines, raw materials, machinery, and equipment.<\/li><li>With an extensive database, Mashroo3k enhances the accuracy of its forecasts and analyses, strengthening its risk management capabilities.<\/li><\/ul><\/div><\/div><\/div>\n\n\n<!-- Study Benifites -->\n<div class=\"content-card study-benifites tabs\">\n    <!-- Tabs Menu -->\n    <ul class=\"tabs-menu head\">\n                <li data-tab=\"tab-1\">Project Features<\/li>                <li data-tab=\"tab-2\">Study Contents<\/li>                <li data-tab=\"tab-3\">Sector Indicators<\/li>                <li data-tab=\"tab-4\">The project as an investment opportunity<\/li>    <\/ul>\n    <!-- Tabs Wraper -->\n    <div class=\"tabs-wraper\">\n        <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-1\">\n            <!-- Grid -->\n            <div class=\"row row-reverse\">\n                <!-- Media -->\n                <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/sa.mashroo3k.com\/wp-content\/uploads\/2021\/08\/\u0627\u0644\u0648\u0627\u062d-\u062e\u0631\u0633\u0627\u0646\u0629-\u0645\u0633\u0628\u0642\u0629-\u0627\u0644\u0635\u0646\u0639-1.jpg\" alt=\"\u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0642\u0637\u0627\u0639\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <ul>\r\n<li>Products of the highest quality.<\/li>\r\n<li>Application of approved quality standards.<\/li>\r\n<li>Application of approved health requirements.<\/li>\r\n<li>Latest packaging technology.<\/li>\r\n<li>Management of development and marketing ideas, to increase competitive advantages. <\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-2\">\n            <!-- Grid -->\n            <div class=\"row\">\n                <!-- Content -->\n                <div class=\"col-12 col-m-6 rich-content\">\n                    <p><strong>Executive Summary<\/strong><\/p>\r\n<ul>\r\n<li>About the project<\/li>\r\n<li>Financial indicators<\/li>\r\n<li>Justifications for establishing the project<\/li>\r\n<li>Government investment incentives in the project field<\/li>\r\n<li>Target Markets<\/li>\r\n<li>Project indicators and final results<\/li>\r\n<\/ul>\r\n<p><strong>Study of project services\/products<\/strong><\/p>\r\n<ul>\r\n<li>Study of project services\/products<\/li>\r\n<li>Description of the project and all its products\/services<\/li>\r\n<\/ul>\r\n<p><strong>Market Size Study<\/strong><\/p>\r\n<ul>\r\n<li>Familiarity with distribution channels<\/li>\r\n<li>Consumer behavior, desires and nature<\/li>\r\n<li>Competitors&#8217; products or services, and what their strengths and weaknesses are. <\/li>\r\n<li>Nature of the market and its characteristics<\/li>\r\n<li>The volume of demand for the product or service provided<\/li>\r\n<li>Available share of target market<\/li>\r\n<li>The best way to market<\/li>\r\n<\/ul>\r\n<p><strong> <\/strong> <strong>Risk study<\/strong><\/p>\r\n<ul>\r\n<li>Identify risks<\/li>\r\n<li>Impact of risks on the project<\/li>\r\n<li>Risk prevention methods<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n                <!-- Content -->\n                <div class=\"col-12 col-m-6 rich-content\">\n                    <p><strong>Technical study<\/strong><\/p>\r\n<ul>\r\n<li>Detailed description of project products Expected production capacity Determination of investment costs<\/li>\r\n<li>Determine the volume of electrical energy and water<\/li>\r\n<li>Determine the project&#8217;s labor needs<\/li>\r\n<li>Determine project requirements<\/li>\r\n<li>Construction and building cost calculation<\/li>\r\n<li>Total Capital Calculation<\/li>\r\n<li>Determine annual operating costs<\/li>\r\n<li>Determine the amount of working capital<\/li>\r\n<\/ul>\r\n<p><strong>Financial study<\/strong><\/p>\r\n<ul>\r\n<li>Total investment costs required for the project<\/li>\r\n<li>Organizing the cash flow and income statements as well as the financial position statement for the first ten years of operation.<\/li>\r\n<li>Determine the expected annual revenues of the project in light of the specified operational capacities.<\/li>\r\n<li>The optimal financing structure for the project in light of the investors\u2019 capabilities and in light of the financing granting conditions<\/li>\r\n<li>Project financial indicators and sensitivity analysis<\/li>\r\n<\/ul>\r\n<p><strong>Organizational and administrative study<\/strong><\/p>\r\n<ul>\r\n<li>Project manpower<\/li>\r\n<li>Organizational structure<\/li>\r\n<li>Job Duties<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-3\">\n            <!-- Grid -->\n            <div class=\"row row-reverse\">\n                 <!-- Media -->\n                 <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/iq.mashroo3k.com\/wp-content\/uploads\/2021\/09\/\u0645\u0624\u0634\u0631\u0627\u062a-\u0627\u0644\u0642\u0637\u0627\u0639-2.jpg\" alt=\"\u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0643\u0641\u0631\u0635\u0629 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u064a\u0629\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <h3 data-start=\"0\" data-end=\"62\"><strong data-start=\"4\" data-end=\"60\">Key Indicators of the Construction Sector in the GCC<\/strong><\/h3>\r\n<p data-start=\"64\" data-end=\"250\">Given the importance of the sector, <strong data-start=\"100\" data-end=\"124\">Mashroo3k Consulting<\/strong> presents the following key indicators of the construction industry across the <strong data-start=\"203\" data-end=\"247\">Gulf Cooperation Council (GCC) countries<\/strong>:<\/p>\r\n<h3 data-start=\"257\" data-end=\"290\"><strong data-start=\"261\" data-end=\"288\">Kingdom of Saudi Arabia<\/strong><\/h3>\r\n<ul data-start=\"291\" data-end=\"765\">\r\n<li data-start=\"291\" data-end=\"368\"><strong data-start=\"293\" data-end=\"341\">GDP contribution of the construction sector:<\/strong> <strong data-start=\"342\" data-end=\"365\">168,750 million SAR<\/strong>.<\/li>\r\n<li data-start=\"369\" data-end=\"416\"><strong data-start=\"371\" data-end=\"403\">Sector\u2019s share of total GDP:<\/strong> <strong data-start=\"404\" data-end=\"413\">4.66%<\/strong>.<\/li>\r\n<li data-start=\"417\" data-end=\"492\"><strong data-start=\"419\" data-end=\"467\">Number of companies operating in the sector:<\/strong> <strong data-start=\"468\" data-end=\"489\">148,026 companies<\/strong>.<\/li>\r\n<li data-start=\"493\" data-end=\"562\"><strong data-start=\"495\" data-end=\"533\">Number of employees in the sector:<\/strong> <strong data-start=\"534\" data-end=\"559\">3,541,977 individuals<\/strong>.<\/li>\r\n<li data-start=\"563\" data-end=\"648\"><strong data-start=\"565\" data-end=\"616\">Value of projects executed (latest statistics):<\/strong> <strong data-start=\"617\" data-end=\"645\">311,563,369 thousand SAR<\/strong>.<\/li>\r\n<li data-start=\"649\" data-end=\"765\"><strong data-start=\"651\" data-end=\"693\">Saudi Arabia leads the regional market<\/strong>, with an annual construction market value exceeding <strong data-start=\"746\" data-end=\"762\">$100 billion<\/strong>.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"772\" data-end=\"802\"><strong data-start=\"776\" data-end=\"800\">United Arab Emirates<\/strong><\/h3>\r\n<ul data-start=\"803\" data-end=\"1072\">\r\n<li data-start=\"803\" data-end=\"880\"><strong data-start=\"805\" data-end=\"853\">GDP contribution of the construction sector:<\/strong> <strong data-start=\"854\" data-end=\"877\">123,953 million AED<\/strong>.<\/li>\r\n<li data-start=\"881\" data-end=\"927\"><strong data-start=\"883\" data-end=\"915\">Sector\u2019s share of total GDP:<\/strong> <strong data-start=\"916\" data-end=\"924\">8.3%<\/strong>.<\/li>\r\n<li data-start=\"928\" data-end=\"1002\"><strong data-start=\"930\" data-end=\"978\">Number of companies operating in the sector:<\/strong> <strong data-start=\"979\" data-end=\"999\">42,428 companies<\/strong>.<\/li>\r\n<li data-start=\"1003\" data-end=\"1072\"><strong data-start=\"1005\" data-end=\"1043\">Number of employees in the sector:<\/strong> <strong data-start=\"1044\" data-end=\"1069\">1,564,095 individuals<\/strong>.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"1079\" data-end=\"1107\"><strong data-start=\"1083\" data-end=\"1105\">Kingdom of Bahrain<\/strong><\/h3>\r\n<ul data-start=\"1108\" data-end=\"1352\">\r\n<li data-start=\"1108\" data-end=\"1184\"><strong data-start=\"1110\" data-end=\"1158\">GDP contribution of the construction sector:<\/strong> <strong data-start=\"1159\" data-end=\"1181\">936.79 million BHD<\/strong>.<\/li>\r\n<li data-start=\"1185\" data-end=\"1232\"><strong data-start=\"1187\" data-end=\"1219\">Sector\u2019s share of total GDP:<\/strong> <strong data-start=\"1220\" data-end=\"1229\">7.70%<\/strong>.<\/li>\r\n<li data-start=\"1233\" data-end=\"1352\">In <strong data-start=\"1238\" data-end=\"1246\">2016<\/strong>, the sector\u2019s value was <strong data-start=\"1271\" data-end=\"1290\">857 million BHD<\/strong>, but within a few years, it grew to <strong data-start=\"1327\" data-end=\"1349\">945.51 million BHD<\/strong>.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"1359\" data-end=\"1386\"><strong data-start=\"1363\" data-end=\"1384\">Sultanate of Oman<\/strong><\/h3>\r\n<ul data-start=\"1387\" data-end=\"1815\">\r\n<li data-start=\"1387\" data-end=\"1462\"><strong data-start=\"1389\" data-end=\"1437\">GDP contribution of the construction sector:<\/strong> <strong data-start=\"1438\" data-end=\"1459\">1,943 million OMR<\/strong>.<\/li>\r\n<li data-start=\"1463\" data-end=\"1509\"><strong data-start=\"1465\" data-end=\"1497\">Sector\u2019s share of total GDP:<\/strong> <strong data-start=\"1498\" data-end=\"1506\">6.7%<\/strong>.<\/li>\r\n<li data-start=\"1510\" data-end=\"1577\"><strong data-start=\"1512\" data-end=\"1550\">Number of employees in the sector:<\/strong> <strong data-start=\"1551\" data-end=\"1574\">548,999 individuals<\/strong>.<\/li>\r\n<li data-start=\"1578\" data-end=\"1815\">The <strong data-start=\"1584\" data-end=\"1657\">construction sector employs the highest percentage of workers in Oman<\/strong>, accounting for <strong data-start=\"1674\" data-end=\"1683\">22.4%<\/strong> of total <strong data-start=\"1693\" data-end=\"1702\">Omani<\/strong> employees in both the public and private sectors, and <strong data-start=\"1757\" data-end=\"1766\">29.6%<\/strong> of all <strong data-start=\"1774\" data-end=\"1812\">expatriates working in the country<\/strong>.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"1822\" data-end=\"1847\"><strong data-start=\"1826\" data-end=\"1845\">State of Kuwait<\/strong><\/h3>\r\n<ul data-start=\"1848\" data-end=\"2113\">\r\n<li data-start=\"1848\" data-end=\"1923\"><strong data-start=\"1850\" data-end=\"1898\">GDP contribution of the construction sector:<\/strong> <strong data-start=\"1899\" data-end=\"1920\">838.9 million KWD<\/strong>.<\/li>\r\n<li data-start=\"1924\" data-end=\"1971\"><strong data-start=\"1926\" data-end=\"1958\">Sector\u2019s share of total GDP:<\/strong> <strong data-start=\"1959\" data-end=\"1968\">2.14%<\/strong>.<\/li>\r\n<li data-start=\"1972\" data-end=\"2045\"><strong data-start=\"1974\" data-end=\"2022\">Number of companies operating in the sector:<\/strong> <strong data-start=\"2023\" data-end=\"2042\">1,502 companies<\/strong>.<\/li>\r\n<li data-start=\"2046\" data-end=\"2113\"><strong data-start=\"2048\" data-end=\"2086\">Number of employees in the sector:<\/strong> <strong data-start=\"2087\" data-end=\"2110\">187,705 individuals<\/strong>.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"2120\" data-end=\"2144\"><strong data-start=\"2124\" data-end=\"2142\">State of Qatar<\/strong><\/h3>\r\n<ul data-start=\"2145\" data-end=\"2858\">\r\n<li data-start=\"2145\" data-end=\"2221\"><strong data-start=\"2147\" data-end=\"2195\">GDP contribution of the construction sector:<\/strong> <strong data-start=\"2196\" data-end=\"2218\">81,215 million QAR<\/strong>.<\/li>\r\n<li data-start=\"2222\" data-end=\"2269\"><strong data-start=\"2224\" data-end=\"2256\">Sector\u2019s share of total GDP:<\/strong> <strong data-start=\"2257\" data-end=\"2266\">12.1%<\/strong>.<\/li>\r\n<li data-start=\"2270\" data-end=\"2343\"><strong data-start=\"2272\" data-end=\"2320\">Number of companies operating in the sector:<\/strong> <strong data-start=\"2321\" data-end=\"2340\">5,629 companies<\/strong>.<\/li>\r\n<li data-start=\"2344\" data-end=\"2411\"><strong data-start=\"2346\" data-end=\"2384\">Number of employees in the sector:<\/strong> <strong data-start=\"2385\" data-end=\"2408\">840,999 individuals<\/strong>.<\/li>\r\n<li data-start=\"2412\" data-end=\"2503\">The <strong data-start=\"2418\" data-end=\"2500\">construction sector employs over 40% of Qatar\u2019s economically active population<\/strong>.<\/li>\r\n<li data-start=\"2504\" data-end=\"2674\">The <strong data-start=\"2510\" data-end=\"2540\">sector is highly promising<\/strong>, making <strong data-start=\"2549\" data-end=\"2607\">investment in construction activities highly lucrative<\/strong> due to population growth and ongoing infrastructure development.<\/li>\r\n<li data-start=\"2675\" data-end=\"2858\">Experts predict that the <strong data-start=\"2702\" data-end=\"2779\">construction market will grow at a rate of 4.2% over the next three years<\/strong>, with the sector\u2019s total value expected to reach <strong data-start=\"2829\" data-end=\"2855\">$10.5 trillion by 2023<\/strong>.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"2865\" data-end=\"2905\"><strong data-start=\"2869\" data-end=\"2903\">The Global Construction Sector<\/strong><\/h3>\r\n<ul data-start=\"2906\" data-end=\"3145\" data-is-last-node=\"\" data-is-only-node=\"\">\r\n<li data-start=\"2906\" data-end=\"2991\">In <strong data-start=\"2911\" data-end=\"2919\">2020<\/strong>, the <strong data-start=\"2925\" data-end=\"2955\">global construction output<\/strong> was valued at <strong data-start=\"2970\" data-end=\"2988\">$10.7 trillion<\/strong>.<\/li>\r\n<li data-start=\"2992\" data-end=\"3145\" data-is-last-node=\"\">The market is expected to <strong data-start=\"3020\" data-end=\"3073\">grow by 42% ($4.5 trillion) between 2020 and 2030<\/strong>, reaching a <strong data-start=\"3086\" data-end=\"3113\">total of $15.2 trillion<\/strong> by the <strong data-start=\"3121\" data-end=\"3142\">end of the decade<\/strong>.<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-4\">\n            <!-- Grid -->\n            <div class=\"row\">\n                <!-- Media -->\n                <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/iq.mashroo3k.com\/wp-content\/uploads\/2021\/09\/\u0627\u0644\u0641\u0631\u0635-\u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631\u064a\u0629-1.jpg\" alt=\"\u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <p>The construction sector contributes approximately 13% of the global GDP, and this percentage is expected to rise to 13.5% by 2030. According to our available statistics, infrastructure will top the list of the fastest-growing sub-sectors in the construction sector, at a rate of 4% during the period (2020-2030).<\/p>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- \/\/ Tab Content -->\n    <\/div>\n    <!-- \/\/ Tabs Wraper -->\n<\/div>\n<!-- \/\/ Study Subjects -->\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":17912,"template":"","studies-categories":[43],"studies-tags":[],"yst_prominent_words":[],"class_list":["post-17911","studies","type-studies","status-publish","has-post-thumbnail","hentry","studies-categories-construction-sector"],"_links":{"self":[{"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/17911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies"}],"about":[{"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/types\/studies"}],"version-history":[{"count":3,"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/17911\/revisions"}],"predecessor-version":[{"id":18115,"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/17911\/revisions\/18115"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/media\/17912"}],"wp:attachment":[{"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/media?parent=17911"}],"wp:term":[{"taxonomy":"studies-categories","embeddable":true,"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies-categories?post=17911"},{"taxonomy":"studies-tags","embeddable":true,"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies-tags?post=17911"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/iq.mashroo3k.com\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=17911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}